We are building a photovoltaic power station consisting of 11,232 modules with a nominal power of 6 MW for Hidroelektrarne na Spodnji Savi, d.o.o. (HESS for short).
The solar power station will be connected to the existing hydroelectric power plant via a cable line and will be treated as the fourth aggregate of the Brežica Hydroelectric Power Plant. Our work is scheduled to be completed in the fall of 2022.