EN
Show menu

News

Riko entrusted with the construction of a wastewater draining and treatment system in Carinthia

16. 12. 2012
The mayors of Radlje ob Dravi (Alen Bukovnik), the mayor of Dravograd (Marijana Cigala) and Riko`s managing director (Janez Škrabec) signed a contract for the final two sequences in a group of projects »Wastewater draining and treatment in the river basin of Drava – Upper Drava«. In frames of this contract we will finally be able to regulate the draining and treatment of wastewater and protection of water resources in the river basin of Upper Drava.
Riko and its partner Pomgrad were selected in an open tender and named contractors for the entire project.


They were entrusted with the construction of a sewage system and waste water treatment plant in Muta-Vuzenica and Selnica ob Dravi, the construction of a sewage system and waste water treatment plant in Radlje ob Dravi and sewage system construction in Dravograd. The value of the entire system adds up to 27,314,696.17 EUR (VAT excluded).

From the middle or second-half of 2015 onwards Riko will take care of collecting and treatment of waste water in the river basin of Drava.

The project is partially financed from the Cohesion Fund of the European Union in the frame of the Operational Programme of Environmental and Transport Infrastructure Development for the period 2007-2013, developmental priorities »Environmental protection – water sector« and priority guidelines »Collecting and Treatment of Waste Water«.