The mayors of Radlje ob Dravi (Alen Bukovnik), the mayor of Dravograd
(Marijana Cigala) and Riko`s managing director (Janez Škrabec) signed a
contract for the final two sequences in a group of projects »Wastewater
draining and treatment in the river basin of Drava – Upper Drava«. In
frames of this contract we will finally be able to regulate the draining
and treatment of wastewater and protection of water resources in the
river basin of Upper Drava.
Riko and its partner Pomgrad were selected in an open tender and named contractors for the entire project.
They
were entrusted with the construction of a sewage system and waste water
treatment plant in Muta-Vuzenica and Selnica ob Dravi, the construction
of a sewage system and waste water treatment plant in Radlje ob Dravi
and sewage system construction in Dravograd. The value of the entire
system adds up to 27,314,696.17 EUR (VAT excluded).