Adaptation of the existing Javornik dam, construction of an intake facility with a settling tank, construction of an engine room with turbine outflow the required infrastructure.
As part of our operations, we will adapt the existing Javornik dam, construct an intake facility with a settling tank, build an engine room with turbine outflow and the entire infrastructure needed for the Ferlach SHPP.