Replacement of hot water boilers GVL1 and GVL2, replacement of the steam boiler BKG 1 and the replacement of the burners on the district heating boiler VKLM 5 in the Power Plant TOŠ

Scope of works
Preparatory works, dismantling of the old equipment in boiler, building reconstruction of the old boiler, arrangements for the supply of premises and the control of surveillance equipment for the operation of the hot water boilers and steam boiler, external regulation, installation of the new hot water boilers VK1 and VK2, installation of a new steam boiler PK1, connection of the steam boiler at ELKO (heating oil), replacement of burners in the district heating boiler, new command cabin - finishing the operation of the hot water boiler VKLM 5, training of personnel investor to operate with new devices, finishing works

Hot water boilers GVL1 and GVL2,steam boiler BKG 1, the burners on the district heating boiler
Hot water boilers GVL1 and GVL2,steam boiler BKG 1, the burners on the district heating boiler
Hot water boilers GVL1 and GVL2,steam boiler BKG 1, the burners on the district heating boiler
Hot water boilers GVL1 and GVL2,steam boiler BKG 1, the burners on the district heating boiler
Hot water boilers GVL1 and GVL2,steam boiler BKG 1, the burners on the district heating boiler
Hot water boilers GVL1 and GVL2,steam boiler BKG 1, the burners on the district heating boiler
Area
Energy - Power Systems
Heating plants
Year
2015
Location
Slovenia
Client
JP Energetika Ljubljana